ASTM A53 GrB Sch40 Carbon Steel Pipe
Size:1/2"-48"
WT:2.77mm-17.48mm
Length:5.8m-20m
Type:Seamless Steel Pipe, welded pipe
We are glad to introduce our company
China National Building Materials (Group) Corporation
as the largest group corporation of building materials with total asserts of 13 billion Yuan and total staff of 30 000. For many consecutive years, CNBM is among the top 500 Chinese companies.
For the steel pipes and pipe fittings items we can provide as following:
Elbow
- Long, Short radius; 45, 90 & 180 degrees;
Tees
- Equal Tee & Reducing Tee;
Reducers
- concentric & eccentric reducers; Cap;
Flange
- plate, slip on, welding neck, thread, blind;
Pipe
– welded, seamless, hot dipped galvanized steel pipe, & steel pipe with PE coating
Our products are widely used in many professional constructions and Oil & Gas projects in Chinese market and international markets. The products scope developed from general carbon steel and alloy steel which was produced at the beginning of the company to the present high-grade steel heavey-caliber fittings used for four big size pipelines with P91,P92. The oil & gas transfer pipeline such as X70,X80 and X100 serial.We cooperate with CNPC, SINEPEC finished many projects in china and on the world.
Seamless Steel Pipe
1) Size:1/8'' to 24''
2) Wall thickness: 1mm to 35mm
3) Standard:APL 5L,API 5CT,ASTM A106,ASTM A53,EN,ISO
1
Product
Steel Pipe
2
Type
Hot rolled ,cold drawn or precision cold rolled steel tubes are available here
3
Application
use for oil well, boilers, precision machines, petro-chemical, ship, structure pipe, automobile, shock absorber, building, geology, fluid tubes, line pipe etc
4
Mill Certificate
Mill Test Certificate will provide
5
Length
5.8m 6m 11.8m 12m or any other length according request
6
SPEC
OD : 3/8" ~ 88" WT: 1 ~ 60MM
7
Marking
P/O No SPEC. Grade Size Heat No. or according requirement;
8
Packing
Black painting, end beveled, ends protected with plastic caps. In bundle
9
Delivery
30days after receiving the advanced payment ;
10
Payment term
T/T 30% prepayment to start production, the rest payment by T/T on fax of B/L after shipment or by L/C at sight L/C will be negotiable in any bank of China
11
Tolerance
Quantity and total amount tolerance: -5%/+5%;
12
Testing
We have professional testing equipments such as ultrasonic testing machine, eddy current testing machine, mechanics testing machine to make sure high quality
13
Delivery port
Shanghai port or Tianjin port
14
Certificates
ISO9001 API5L API5CT TS16949 ISO14001
No comments:
Post a Comment